Vertiv and NVIDIA team up to speed up AI data centre deployment

https://cdn1.expresscomputer.in/wp-content/uploads/2020/07/14184636/hitech-data-centre-ec.jpg

Vertiv and NVIDIA have introduced an integrated approach to designing and deploying AI data centres, combining virtual infrastructure simulation with factory-built systems to reduce deployment timelines. The companies estimate that the approach could cut infrastructure deployment time by up to 50% and deliver up to 30% more cumulative AI token output in the first 12 months, with the same installed capacity.

Announced at NVIDIA GTC Berlin on November 16, the approach brings together pre-engineered AI factory reference designs, virtual validation and prefabricated infrastructure. It is intended to address delays associated with separately designing and integrating computing, power, cooling and facility systems during data centre development.

Polar Data Centers is applying the factory-built deployment model to the first 41 MW phase of its AI data centre campus at Herøya, Norway. The multiphase project is planned to scale up to 100 MW.

Under the proposed model, infrastructure teams can configure existing...

Copyright of this story solely belongs to www.expresscomputer.in. To see the full text click HERE

Read more